Empowering all stakeholders to collaborate at every phase of the building process
MTWO integrates the management of entire project lifecycle with 5D BIM ( 3D models + time + cost ) in one platform. From planning, building to operating, MTWO supports project processing with consistent data models and comprehensive functions. It makes your project management more connected, visualized, and efficient.
"I think 5D works, 5D works for Deutsche Bahn.
We don’t want to
stop at 5D. "
- Mathias Pott-Stahmeyer
Deutsche Bahn
Centralizing project life cycle management in one cloud helps eliminate info silos and keep teams on the same page.
BIM models connected with time and cost data for project planning and execution allows you to optimize schedules and costs.
Multi-stakeholders' early involvement to develop the solid plan and the 5D simulation helps to reduce risk and rework.
Develop a time and cost optimized 5D plan
Import architectural BIM models, structure models and MEP models from mainstream modelling software for cross-platform model integration, collision detection and model quality improvement. The quality-assured models is the basis for subsequent model-oriented operation, optimizing planning and construction process significantly.
With the smart plugin – iTWO 3D, models can be even real-time synchronized between Revit and MTWO to eliminate back and forth rework.
Simplify your quantity takeoff with MTWO’s innovative 3D Takeoff approach. By using the predefined takeoff rules in the Construction System, quantity surveyor will easily generate automated quantities from 3D models.
The calculation can go deep to object level, be presented in BIM models, and exported in different level of details reports to facilitate decision making.
Combine the power of 3D models and data from previous projects to create the most thorough, precise construction estimates. Realize dynamic cost management as cost estimates are always networked with real costs
The 5D BIM capability of MTWO enhances collaboration between teams as the estimates are connected with models, BOQ, scheduling and procurement to share data in real time.
Create reliable schedules to reduce wastes, mitigate risk and optimize work.
MTWO helps schedulers produce graphical schedules with Line of Balance to see potential conflicts, and perform 5D simulation to detect construction risk early in the planning stage to avoid costly mistakes in the construction phase.
5D BIM simulation enables all stakeholders to communicate and cooperate in the planning stage to decide on the best plan.
Compare 5D simulations side by side to evaluate different time and cost scenarios, forecast cash flow and detect mistakes to avoid changes in construction phase.
Tender: Send out tender invitation and get quotations from vendors through online portals, compare quotes automatically and evaluate vendor performance to choose the best bidder.
Bid : Increase bid win rate with the streamlined bidding process. Easily create bids with the most up-to- date data from BOQ and estimate modules.
Manage projects with confidence
Improve project delivery by controlling project progress effectively with MTWO Project Management.
Realize lean management from the procurement side as MTWO helps you:
Better manage jobsite performance through a proactive safety and quality management approach.
With the MTWO mobile app, onsite professionals can get access to inspection list and report observation in real time from their mobile devices. It helps them identify hazards earlier and take actions to resolve the problems before it turn into costly incidence.
The system also provides a dashboard that shows the statue of all defects for tracking and acceptance.
MTWO comes with mobile cloud applications, so users can capture data directly from the field, in real time. Respond to issues or make instant requests – all from your smart phone or other mobile device.
Transfer BIM data smoothly into the operation phase
Extend 5D BIM to the important area of facility management. With iTWOfm integrated seamlessly into MTWO, all 5D BIM data from planning and construction can be directly transferred to operation phase.
The master data forms the basis for permanently and securely managing your properties, buildings and facilities.
Maintenance, cleaning, key management, smart maintenance, internet of things, operator responsibility - with iTWO fm you can map all facility management processes in a certified manner.
To accompany a building on the software side throughout its entire life cycle is a complex task. MTWO makes it easy to manage and retrieve the relevant data in the various phases.
MTWO provides necessary data all the time. In the planning process, all relevant basic data can be quickly and easily transferred to the CAFM for the operatingphase. Cooperatively data from CAFM, is made available to all other areas and can therefore be used consistently.