CASE STUDY

Julius Berger International

GmbH

Optimized Collaboration at Julius Berger International with BIM 5D

*iTWO is the core solution of MTWO Cloud

001.png

About JBI

With over 300 employees, Julius Berger International is one of the largest engineering firms in the Rhine-Main metropolitan region. At the office in Wiesbaden, the team provides all of the integrated design and engineering services along with supplementary services. For optimal organisation, the departments are split into the Design & Engineering department, tasked to handle the usual planning services, and the Tender & Project Support unit which takes care of construction-related services and project management. When it comes to the future of construction, they do not just want to engage in dialogue about it; they want to help shape it. 

Communication Tower

As a general planner, the company, part of the Julius Berger Group, was responsible, in consortium with the Siemens Power and Gas Division, Erlangen, for the planning and construction of the AZURA power plant in Benin City, Nigeria. The complex construction work, an international collaboration, was realized entirely in a model-oriented way, using BIM methods.

Model-based planning and realization of a gas power plant in Nigeria

Julius Berger International GmbH (JBI) has made a name for itself through innovative engineering projects, demanding logistics and extensive service provision in the construction sector. The companies in the Julius Berger Group are responsible, in consortium with the Siemens Power and Gas Division, for the general planning and construction of the AZURA gas power plant in Benin City, Nigeria. Already in 2014, the decision was taken to realize this complex and demanding construction project, carried out in international collaboration with international partners, in a fully model-oriented way using BIM methods (Building Information Modeling). The new-build in Nigeria took shape over a period of 28 months in total. In building phase 1, the turbine hall, for in total three turbines with 150 megawatts of power, and including the required peripheral buildings and infrastructure, was completed.

5D BIM planning sustainably strengthens collaboration

To create a basis for transparent and trusting collaboration among the planning teams involved, all plan data were imported into the RIB BIM 5D software iTWO already at an early stage of bid processing. In iTWO 5D, in the first stage, the different quantities were checked. Markus Hoffmann, BIM coordinator at JBI, then completed an overall model on the basis of the project partners’ sub-models, which served in all subsequent phases of the project as a coordination model and could also be referred to on site for all project-relevant decisions. Thus, it offered comprehensive support at an early stage of planning in recognizing collisions in the amalgamation of the draft plans from different planners and contributed, in this way, to the frictionless, fault-free execution of the construction. The coordination model, in interplay with the end-to-end software solution RIB iTWO 5D, provided comprehensive support for the partner companies in all further planning and construction phases – from calculation through procurement to controlling. The option of working with a consistent 3D/5D model sustainably strengthened the cooperation of the involved specialist planning disciplines.

The new-build in Nigeria took shape over a period of 31 months in total. In building phase 1, the turbine hall, for in total three turbines with 150 megawatts of power, and including the required peripheral buildings and infrastructure, was completed.

A shared platform for all partners

“The greatest challenge in this project was in coordinating the many different specialist planning disciplines with their very different IT solutions, using a single model and a shared platform from which all users could benefit,” explains project leader Oliver Berger. “At the AZURA Power Plant, what we needed to do was to integrate, as a unified whole, construction-specific models with CAE (computer aided engineering) systems from the mechanical engineering field,” he continues. JBI employs Revit software by Autodesk in the fields of architectural design, structural planning and building services planning. In the infrastructure sector, the company also works with an Autodesk planning solution, Civil 3D. Partner companies were contracted for the steelwork required in this project; they used Allplan, a BIM tool by Nemetschek. Last but not least, the plant engineering-specific planning tool, AVEDA PDMS (Plant Design Management System) used by the project partner Siemens Power and Gas Division, had to be linked in. The amalgamation took place in the project-checking software system Navisworks, by Autodesk.

“BIM 5D planning, with the coordination model and thoroughgoing integration in RIB iTWO 5D, formed the foundation for an optimal planning process.”

- Oliver Berger

Julius Berger International GmbH

Construction of a realizable digital twin

“The BIM 5D planning with the coordination model and the continuous integration with RIB iTWO 5D formed the basis for an optimized planning process,” reports Oliver Berger. “In this way, a structurally feasible, digital twin is initially constructed virtually on the computer in an early planning phase through intensive coordination with one another. All changes are thus visible and comprehensible to planners in all disciplines and can be integrated into the construction process at any time, ”he adds.

At the same time, 5D BIM planning lays the foundations for optimized resource planning in the construction phase. Since the construction data are consistently available in the early phases and the construction process has already been run through virtually in advance, the individual work steps and processes can be coordinated with all partners involved at an early stage. The visual representation of the model supports a better understanding of the cooperation during the construction process. "With 5D planning, we ensure the best possible partnership-based cooperation between the construction teams and companies," says Berger.

The coordination model created in Navisworks, in interplay with the end-to-end software solution RIB iTWO 5D, provided comprehensive support for the participating companies in all planning and construction phases – from calculation through procurement to controlling. The option of working with a thoroughgoing 3D/5D model sustainably strengthened the cooperation of the involved specialist planning disciplines.

iTWO creates a solid basis throughout the process chain

The RIB software solution iTWO 5D offered extensive support in all project phases. The process began with quantity calculation by model and went on to include the creation of bills of quantities and calculation. The tendering and price comparison stages followed, as did the creation of a cost schedule on the basis of the process planning IT solution used at JBI. Then, the performance specification for construction progress reports with the software was created. In addition to this, iTWO 5D was used for the comparison of actual/planned costs including the import of actual costs to the company’s SAP system. The RIB solution created an all-round solid basis along the process chain.

“With 5D planning, we ensure the best possible collaboration between partners in the teams and companies carrying out the construction.”

- Oliver Berger

Julius Berger International GmbH

Building time simulation as a basis for coordination

In contrast to classical, alphanumeric construction planning, the company reports that, with the 5D BIM method, very detailed work is possible already at an early stage. Plan changes and and supplementary alterations can be markedly reduced using a model-oriented working process. “The simulation of the construction process, including the determination of construction times, brought a particularly great added value for all involved partners. The companies could estimate the duration of their deployment and length of their tasks early on, and thus ensured optimal coordination with further partners. The valuable experiences gained in the course of this demanding project in the field of model-oriented planning and construction will naturally be carried across to the planning services we render within Germany,” Oliver Berger concludes.

Gray Structure

Advantages through BIM 5D

Precise, model-based building time simulation

Secure coordination platform for all project participants

BIM 5D throughout ensures the quality of the project

Build your own success with MTWO.

Schedule a demo today with our product experts to see how a complete construction cloud solution can help you deliver your project better, faster and smarter.

© 2020 RIB Software SE. All rights reserved.

/ Privacy / Terms of UseLegal Terms /

  • White Facebook Icon
  • White Twitter Icon
  • White YouTube Icon
  • White LinkedIn Icon
  • White Instagram Icon